open

Feature #3: Submit RFQ for data center

Feature #2: Update Wstar concept plan

Cooling design needs to be updated

Added by Petri Välisuo 9 months ago. Updated 8 months ago.

Status:
New
Priority:
Normal
Assignee:
Start date:
08/20/2024
Due date:
09/02/2024 (about 8 months late)
% Done:

0%

Estimated time:

Description

Current cooling and heat rejection plan is not ready

  • No hot/cold isles, but two racks with closed air circulation and a row cooler
  • If heat pump is used, it needs to be connected so that it can be used to simulate all kinds of heat reuse situations
Actions #1

Updated by Petri Välisuo 8 months ago

  • Due date changed from 08/26/2024 to 09/02/2024
  • Assignee changed from Petri Välisuo to Shiva Sharma

Lets try to solve this together with Hussain and Me